Kinetic Solutions

Home » Offices » Kinetic Solutions

Kinetic Solutions – Office Fit Out

Kinetic Solutions – Auditorium & Maintenance

RSR was introduced to Kinetic through a recommendation, based on our ability to create an inspiring design for the new Kinetic office, and deliver on that vision. In order to give the client a feel for what their space would look like we created full 3D visuals of the offices, including fly-through videos.

This was a high-end project which showcased RSR’s creativity and quality of service. High-spec feature walls, curves and smooth lines, a quality kitchen and tea-point area and even a live foliage wall helped to make this space stand out from the crowd. RSR’s proactive and responsive approach were key to the success of this project. Using our core principles of cost efficiency, technical expertise, as well as high quality project and site management gave us the ability to adapt and flex with any changes required throughout the project.

RSR had previously completed Kinetic Solutions new office fit out and reached out for further refurbishment and maintenance work

Rather than accepting the standard set up for large conferences Kinetic Solutions opted for a comfortable set up for people to relax into while they work through the inclusion of turfed benches and speaker area, open spaces, large screens for full room visibility, and smaller desks for break-out areas.

Kinetic Solutions always strive to approach the work environment differently, this is reflected in their design choices shown here with their auditorium refurbishment

Industry: Technology
Project Value: £300,000
Project Length: 7 Weeks

Scope of works

Design, Supply and Installation of the following:

  • New suspended & MF ceilings

  • Feature walls including a curved walnut slat wall and a ‘live plant’ wall

  • Glazed partitions

  • Tea points with white goods and decorative wall tiling

  • Wooden panelled walls to meeting rooms

  • New flooring

  • Feature pendants

  • New LED lighting panels

  • All electrical and data works

  • Complete furniture package

  • Custom manifestations to glazed partitions, with a ‘Bletchley Park’ theme.

  • HVAC

  • Project management

Industry: Technology
Project Value: £45,000
Project Length: 4 Weeks

Scope of works

Design, Supply and Installation of the following:

  • Flooring Layouts

  • Contemplation Room Partitions

  • Managers Office Flooring, Walls, and Ceiling

  • Auditorium

  • Meeting Room Insulation

  • Decoration

  • Electrical & Data

  • New Fire Alarm System Throughout

Download
Download

We Are Accredited By

Connect with us on one of our social platforms

Facebook Icon

Need To Know A Little More About RSR?

Contact Us