Published in Case Studies

E-Commerce giant – Swansea

Published:

Case Study Stats TEST

Work Type:
Office Fit Out
Project Length:
8 weeks
Project Value:
Multi-million

This E-commerce Giant needed to expand the capacity of their warehouse located in Swansea and chose RSR to act as principal designer and principal contractor. This involved managing health and safety along with a sub contractor on site to enforce the tight programme. The tasks were delivered on time, within budget and with no health and safety incidents on site.

Scope of works

Design, Supply and Installation of the following:

  • Principal contractor for 2017 capacity expansion project.
  • Oversee all contractors’ welfare and Health and safety on site.
  • Review design and manage installation of new pick tower.
  • Mechanical air movement throughout the new pick tower – Design and Install
  • Electrical supplies and lighting throughout the pick tower – Design and Install
  • Fire alarm system and VESDA through the pick tower – Design and Install
  • Sprinkler system throughout the pick tower – Design and Install
  • 2x Goods lifts within the pick tower – Design and Install
  • CCTV throughout new Pick tower – Design and Install
  • Installation of new sprinkler tank and suction line to pump house.
  • Install new conveyor system within working warehouse.