Case Study Stats TEST
Work Type:
Office Dilapidation
Project Length:
8 weeks
Project Value:
£200,000
RSR were tasked with the dilapidation project at Metropolitan House to bring a prime office space back to it’s original state. With challenges such as a no ‘goods lift’ available, a plan was put together to complete the work seamlessly.
Metropolitan House Dilapidations involved a mixture of replace and repair where needed. Some of the work included partitioning taking down and removed, carpet tiles uplifted and replaced with new Milliken Carpet tiles and blinds repaired and replaced where needed.
Scope of works
Design, Supply and Installation of the following:
- Remove all exisiting partitions, tea points, floorboxes, and furniture
- Uplift carpet tiles
- Repair suspended ceilings and replaced damaged ceiling tiles
- Replace all lighting to LED panels
- Repair blinds and install new where damaged
- Re-configure the re-balance A/C system to open plan
- Decoration throughout
- Lay new Milliken carpet tiles throughout