Published in Case Studies

Kinetic Solutions

Published:

Case Study Stats TEST

Work Type:
Maintenance
Project Length:
4 weeks
Project Value:
£45,000

RSR had previously completed Kinetic Solutions new office fit out and reached out for further refurbishment and maintenance work

Rather than accepting the standard set up for large conferences Kinetic Solutions opted for a comfortable set up for people to relax into while they work through the inclusion of turfed benches and speaker area, open spaces, large screens for full room visibility, and smaller desks for break-out areas.

Kinetic Solutions always strive to approach the work environment differently, this is reflected in their design choices shown here with their auditorium refurbishment

Scope of works

Design, Supply and Installation of the following:

  • Flooring Layouts
  • Contemplation Room Partitions
  • Managers Office Flooring, Walls, and Ceiling
  • Auditorium
  • Meeting Room Insulation
  • Decoration
  • Electrical & Data
  • New Fire Alarm System Throughout