Published in Case Studies

FCLG

Published:

Case Study Stats

Work Type:
Office Fit Out
Project Length:
12 weeks
Project Value:
--

Bicester, Oxfordshire - Office Fit-Out Project Length: 12 week programme Size: 382 Square Metres

The FCLG Fit-Out was completed in 12 weeks whilst working in an occupied building and ensuring our project delivery didn’t interfere with the client’s day to day operations.

About FCLG

FCLG is a leading provider of specialist fleet management, motor claims and vehicle support services, working with vehicle manufacturers and fleet operators across the UK from its headquarters in Bicester. By combining experienced people, in-house technology and detailed operational insight, FCLG helps clients reduce costs, improve driver experience, maintain control of their vehicle fleets and streamline complex administrative processes. Its flexible, customer-focused approach has established FCLG as a trusted long-term partner, delivering reliable, scalable solutions designed around the specific needs of each client.

Scope of Works

  • Internal Strip-Out and Soft Demolition
  • Enabling and Builders Works
  • Structural Steelwork Installation
  • First Fix Mechanical and Electrical Services
  • Metal Stud Partitioning
  • Tape, Jointing and Plastering
  • Ceiling Installation
  • Second Fix Mechanical and Electrical Services
  • Mechanical Air Conditioning and Ventilation Systems
  • Concrete Floor Preparation
  • Wall and Floor Tiling
  • IPS Panelling
  • Kitchen Installation
  • Bespoke Joinery
  • Bespoke Pressed Metalwork
  • Glass Partitioning
  • Manifestation Graphics
  • Fire Stopping
  • Decorations
  • Wall Finishes
  • Floor Finishes