Case Study Stats TEST
Throughout the early design stages of the FSC projects, RSR worked in close collaboration with the client to ensure that all requirements were clearly understood and integrated into the planning process. This proactive engagement allowed us to align our technical solutions with the client’s operational goals from the outset, fostering a strong partnership built on transparency and trust. A significant challenge of these projects was executing works on busy, live operational sites.
RSR successfully navigated this complexity by implementing robust planning and coordination strategies. We maintained continuous communication with the site teams to ensure that all construction activities were carried out without disrupting daily operations.
Safety remained a top priority throughout. RSR implemented stringent health and safety protocols, working hand-in-hand with the client to uphold a safe working environment for all personnel. Our team adapted to the dynamic nature of the sites, ensuring that both our workforce and their staff could operate safely and efficiently during the project lifecycle.
Scope of works
Initial ground investigations
Full project design
CDM set up
Principal contractor role
Civil works to include Main Structure/Pad foundations, trench works for services & drainage
Power, Network and Fire Alarm infrastructure
Removal of existing and installation of new road markings
New protection barriers and signage