Published in Case Studies

BV Coffee House

Published:

Case Study Stats TEST

Work Type:
Office Fit Out
Project Length:
8 weeks
Project Value:
Approx £150,000

RSR were given the task by BV Coffee House of carrying out the works during a national pandemic. The refurbishment included a full strip out, combination of brick and wooden cladded walls bespoke seating booths, front and back serving counters, power and lighting installation.

Scope of works

Design, Supply and Installation of the following:

  • Design and branding
  • Preparation and fitting of brick slips
  • Rustic timber cladding to walls with matching Bespoke seating booths and matching cladded tables USB/power sockets to booths
  • Bespoke design and finishing of unique lighting features Bespoke stainless steel back and front counters Containment for lighting and power
  • Exposed ceiling with a contemporary look